MARKOOL โ€” SKD / CKD assembly scope worksheet Planning tool ยท 2026-10-03 This is a blank project brief, not a released bill of materials, technical drawing or test record. Complete known fields; mark unknown items for review. Use explicit units and drawing revisions. 1. PROJECT Company / contact: Destination country: Target cabinet model / reference: Finished-product application and pack dimensions: First-order / annual quantities: Target timing: Supply format requested (finished / SKD / CKD / to discuss): 2. COMPONENT LIST โ€” repeat for each supplied part or assembly Part or assembly name: Part code / drawing and revision: Quantity per finished cabinet / ordered quantity: Dimensions and units / mating interface: Material / finish / electrical rating where applicable: Included fittings: Supplied by MARKOOL / supplied locally / unresolved: Substitution approval needed: Inspection method / acceptance criteria / record required: Individual protection / package identification: Component groups to review: - Cabinet / foamed panels / metal and PVC parts - Doors / glass / hinges / seals - Compressor / condenser / evaporator / fans / pipework - Lighting / controls / plug / wiring - Shelves / baskets / supports / internal fittings - Castors / feet / accessories / project-specific tooling 3. OPERATIONS AND RESPONSIBILITIES โ€” for each, name the responsible party and evidence Fabrication / foaming: Mechanical assembly: Door and shelf fit: Electrical assembly and verification: Refrigeration circuit assembly / charging / leak checks: Functional and performance verification: Cleaning / labels / final inspection: Packing / shipment release: Training, instructions and service handoff: Required facilities, tools, fixtures and qualified personnel: Open capability gaps: 4. ACCEPTANCE AND LOGISTICS Approved sample or first-article reference: Inspection plan / method / limits / sample quantity: Handling of missing, damaged or rejected parts: Package count / packed dimensions / gross weight: Component package markings and cabinet-set identification: Destination handling and storage arrangements: Packing plan and supporting documents required: Packing/freight, local assembly, inspection, waste and service cost assumptions: Duty and import-document review owner: Support and replacement-part responsibility: Open questions / action owner / due date: SEND THE BRIEF Email: sales@markool.com Website: https://markool.com/contact?request=quote&category=parts-and-components&purpose=assembly-scope Final scope, available documents, price and timing are confirmed in the quotation and project records.