Finished equipment
Start with the stored product, pack size, temperature and placement. Compare available cabinet formats, then identify the model and configuration for quotation.
Explore the product catalogue →Commercial refrigeration & custom branding partner
From cabinet selection to branded samples and shipment preparation, MARKOOL connects your buying team with the product, manufacturing and support work your project needs.
Process illustration · request the controlled design record for your projectYour brief stays connected
A cabinet can fit the floor plan yet miss the pack size. Artwork can fit a panel yet cover service access. MARKOOL brings these decisions into the same project review, coordinating the manufacturing input so your purchasing and brand teams can approve a consistent configuration.
Process illustration · request the controlled sample record for your projectSample decision
A useful sample review puts the proposed cabinet, drawing and component revision side by side. Record the approved model, sample decision and open actions before using that version for the first article and shipment batch.
The scene illustrates the handoff. For an actual order, request the signed sample record, revision-controlled component list, first-article inspection and batch documents.
Request project records →Workshop and production
Illustrated views of materials, assembly, cabinet handling and packing. For a specific order, request dated production, inspection and shipment records.




From design to shipment
Carry the drawing and component revision from the sample decision to first-article review and shipment identification. Agree the actual records for your order.

Identify the cabinet, door, shelf and refrigeration assembly on one controlled drawing and component list. Mark which revision applies to the sample and list any proposed substitution before the first article is checked.

Use the agreed door assembly and drawing revision to check frame alignment, door clearances and the closed position on the first article. Record any adjustment and repeat the affected check before releasing that configuration for production.

Before shipment release, compare the ordered configuration with the unit identification, carton marks and packing list. Record the batch reference, quantities, loose accessories and any approved exceptions in the handoff.
How we work with you
MARKOOL is your point of coordination across product selection, manufacturing partners and delivery preparation. Agree the responsible parties, document list and approval steps in the quotation so each handoff has a clear purpose.
Use the project brief to name technical, artwork, inspection and shipment decision makers. Outputs are scoped to your order; document availability and any sample or inspection charges are confirmed in the quotation.
Process illustration · request the model-specific test recordTemperature, controls and cabinet function are useful only when the configuration, loading state, ambient condition, duration and acceptance criteria are recorded.
Review the quality framework ↗
Process illustration · packing specification varies by modelPacked dimensions, glass protection, accessories, unit identification, container mix and unloading assumptions belong in the project—not after the order is complete.
Read the loading guide ↗Working together
Start with the responsibilities that matter to your purchasing team.
MARKOOL coordinates the commercial brief, configuration questions and agreed follow-up with manufacturing partners. Your quotation or PI identifies the contracting entity, supply scope and responsibilities; supplier-onboarding documents can identify the relevant manufacturing site.
Ask for a revision note identifying the change, reason and impact on fit, appearance, documentation, price and timing. Record the applicable approval before the changed configuration is released; a similar-looking part should not be treated as an agreed substitute.
Include the proposed inspection stage, checklist, sampling and report needs in the RFQ. Agree site access, timing, cost and the handling of open findings with the parties involved before arranging the visit.
Contact MARKOOL with the order reference, model or serial number and issue details. We coordinate the support review against the agreed warranty and service scope. Review coverage and the support process →
Supplier evaluation
A useful supplier review connects the site, process and documents to the exact cabinet being quoted. Ask for dated, model-specific records before releasing an order.
Open the evidence and sample files →Request an evidence pack ↗