Start with destination and intended use
Requirements vary with the country, product construction and how the equipment is placed or sold. Record the destination, commercial use, installation environment, voltage, frequency and refrigerant before asking which documents apply.
Check the identity on the document
Useful evidence identifies the manufacturer or applicant, product designation, applicable standard, issuing or testing organisation, date and scope. Confirm that the quoted cabinet is included rather than relying on a certificate from another family.
Review the final configuration
A component, controller, plug, heater, screen or refrigerant change may affect the documentation path. Freeze the commercial configuration and ask the supplier to state which evidence covers it.
Build a shipment file list
Agree which reports, declarations, labels, manuals and shipment documents will be supplied, in which language and at what project milestone. Confirm local requirements with qualified compliance professionals before ordering.
Keep a document-to-quotation check record
Mark each document as matched, clarification needed or not supplied. A file can be genuine and still cover a different model, applicant or electrical version. Ask the supplier to explain each mismatch before using it as purchase evidence.
| Compare | Quotation identity | Document identity | Action if different |
|---|---|---|---|
| Entity and model | Contracting party and exact product | Applicant, manufacturer and covered model | Request the relationship and model coverage |
| Configuration | Voltage, frequency, refrigerant and key options | Version and construction described | Request applicability to the final version |
| Scope | Destination and intended use | Standard, issuer, number and date | Verify current scope with the issuing source |
| Delivery | Required files, language and milestone | Available revision and document set | Agree missing files and responsibilities |
Treat configuration changes as a document question
When a heater, controller, door construction, screen, plug or refrigerant changes, identify the change in the file request. Ask whether existing evidence still covers it and what additional review is needed. Do not conclude that a small visual change automatically leaves every compliance document valid.
Use the destination pathways on the compliance page to organize market questions. This guide is a document-checking worksheet, not an assertion that a quoted cabinet already has approval in every destination.

Connect each requested document to the quoted configuration
Start with the destination, intended use and exact cabinet configuration. Compare each supplied file with the quotation and record whether it matches, needs clarification or is still outstanding. Resolve identity or scope differences before relying on the file for the order.
| Review field | Compare with | Record the outcome |
|---|---|---|
| Model and version | Quoted model and models covered by the file | Match, clarify or request missing coverage |
| Named organisations | Applicant, manufacturer and contracting-party information | Explain the relationship where the names differ |
| Electrical and refrigerant configuration | Quoted specification and file scope | Confirm applicability to the final version |
| Destination and intended use | Project brief and document scope | Confirm the required route with the responsible specialist |
| File identity and revision | Document number, issuer, date and current scope | Record the source checked and any follow-up |
Apply the checklist
Check the file for the quoted model.
Send the destination, exact model or proposed configuration, electrical supply, refrigerant and intended use. Ask which current documents cover that version and which remain open.
Request applicable documents ↗