How to import commercial refrigerators from China
Start with the destination, use, cabinet specification and order quantity. Verify the supplier and the documents for that exact configuration, compare quotations on the same delivery basis, approve a sample against written checks, and agree the inspection and shipping record before releasing the batch.
Keep one purchasing file throughout the process. A useful file connects the quotation, model and drawing revision, electrical version, artwork, acceptance criteria, packing plan and unresolved questions. This lets purchasing, engineering and the forwarder work from the same agreed scope.
| Step | What to resolve | Record to keep |
|---|---|---|
| 1. Define the brief | Destination, stored product, site conditions, cabinet format and quantity | One RFQ sent to every shortlisted supplier |
| 2. Verify the offer | Supplier identity, exact configuration and applicable market files | Quotation with assumptions and evidence references |
| 3. Compare total scope | Packing, inspection, transport, destination costs and support | Cost comparison using one currency and delivery basis |
| 4. Approve the sample | Appearance, fit, loading, operation and agreed performance checks | Signed sample record linked to the drawing revision |
| 5. Release the shipment | Inspection outcome, labels, packing and shipping documents | Release record with any exceptions explicitly agreed |
140th Canton Fair: a refrigerator buyer’s meeting checklist
The official 140th Canton Fair schedule lists Phase 1 as October 15–19, 2026, including Household Electrical Appliances. Use the official exhibitor directory to confirm each supplier’s product range, attendance and booth before planning a visit. A category listing alone does not establish that a particular commercial cabinet is on display.
Bring the same RFQ and comparison worksheet to every meeting. Ask permission to photograph the cabinet and its rating label, then attach the images to the exact quoted model. A display sample can have a different door, shelf layout, controller, refrigerant or electrical version from the export configuration you need.
After each meeting, separate what you observed from what the supplier still needs to send. Before selecting a sample, request a written quotation and the missing evidence using the model and revision recorded at the booth. Keep the contact, promised response date and open questions with that quotation.
| At the meeting | Ask the supplier | Take away |
|---|---|---|
| Company and production site | Who contracts, who manufactures this model, and where? | Legal entity, site address and the named quotation contact |
| Display versus export model | Which visible and technical details change for my order? | Model code, rating-label photo and a list of differences |
| Destination evidence | Which current files cover this model and electrical version? | File references and an owner for anything still missing |
| Commercial scope | Which quantity, branding, packing and delivery basis does this price cover? | Written inclusions, exclusions and quotation validity |
| Sample and production | What starts the lead time, and what must the sample demonstrate? | Approval milestones and proposed acceptance checks |
| Follow-up | Who sends the revised quote, drawings and document list, and when? | Contact, agreed date and unresolved items |
Sources and further reading
Define the cabinet before asking for a price
Provide the stored product, target temperature, ambient conditions, door-opening pattern, placement, ventilation limits and power supply. These details help factories quote a suitable system rather than only a similar-looking cabinet. Include bottle, can or food-package dimensions when usable shelf capacity matters.
List external dimensions, door type and handing, glass or solid panels, shelf count and material, lock, casters or feet, controller, lighting, branding, plug, refrigerant, packaging and accessories. Ask suppliers to state every assumption and exclusion. A shared model suffix or similar catalogue image is not enough to confirm the configuration.
Split the requirement into sample, pilot and production quantities. Specify which changes are essential for the first order and which can wait. Ask for the minimum quantity and lead-time trigger for each proposed combination of cabinet, components and artwork; do not assume a standard cabinet and a customised version share the same terms.
Verify the supplier and the model-specific documents
Confirm the legal contracting entity, manufacturing address and relationship between the seller and the production site. Ask who issues the quotation and invoice and who handles technical questions, inspection and warranty claims. Keep the answers in the purchasing file and resolve unexplained changes before the next commercial step.
Request the current specification, drawing, electrical and refrigerant version, applicable market files, proposed temperature-test evidence and inspection format. Check that the model identity and configuration on each file match the offer. A certificate for another product family, a component approval or a logo in a brochure does not by itself establish the status of the complete cabinet.
Agree which documents must be checked before sampling, production and shipment. Have the responsible importer and qualified advisers confirm the requirements for the destination and intended use. Record missing or inapplicable evidence explicitly rather than filling every comparison cell with a check mark.
Compare landed costs on the same delivery basis
Use a cost worksheet, not a fixed percentage added to the factory price. For each offer, record the currency, quantity, quotation date, validity, named delivery place and agreed trade term. Mark which cost lines are included so freight or origin charges are not counted twice.
A practical comparison is the quoted goods and agreed options, plus the costs not already included for inspection, packing, transport, insurance, destination clearance and delivery. Separate one-off tooling, sampling and launch costs from recurring costs per cabinet. Keep unknown charges open until the responsible party supplies a current quote.
Request both packed dimensions and gross weight for the exact packaging revision. Ask the forwarder to compare the proposed model mix and shipment size. A nominal cabinet volume or a generic container count cannot establish the landed cost of your order. Ask the destination adviser to confirm classification and current duties or taxes for the actual product; this checklist does not assign a tariff rate.
| Cost line | Evidence to request | Comparison check |
|---|---|---|
| Cabinet and options | Itemised model, electrical version, artwork and accessories | Same configuration and quantity in each offer |
| Sample and setup | Sample, tooling and artwork charges; any agreed credits | Separate one-off charges from production unit cost |
| Inspection and packing | Inspection scope, packaging revision and any pallet requirements | Included service versus separately charged work |
| Origin and main transport | Named place, freight scope, validity and insurance scope | Identify who arranges and pays for each leg |
| Destination and delivery | Broker and forwarder estimates for the actual shipment | Keep clearance, duties or taxes, handling and final delivery distinct |
| Service and spare parts | Parts list, warranty exclusions and local service plan | Record labour, parts and freight responsibility |
Approve the sample against written acceptance checks
Inspect the sample against the agreed specification and drawing: cabinet size, door motion and seal, shelf spacing, package fit, lock, controls, lighting, plug, labels, artwork and accessories. Record deviations before deciding whether the sample is acceptable. Photographs help with visible details, while technical checks need their own evidence.
For temperature evaluation, agree the ambient conditions, loading, door-opening pattern, sensor positions, test duration and acceptance criteria in advance. A controller display or an empty-cabinet photograph cannot demonstrate how the loaded cabinet performs in the planned location.
Keep visual and technical approvals separate. The production release should identify the approved drawing and artwork revisions, electrical and refrigerant configuration, inspection scope, packaging and accepted exceptions. If a later change affects fit, cooling or market files, confirm whether the sample evidence still applies.
Confirm packing, shipping documents and service before dispatch
Agree the packing method, glass and corner protection, loose-accessory restraint, shipping marks and handling requirements for the exact cabinet. Request packing photographs and a loading plan tied to the actual model mix. Confirm orientation and handling instructions with the manufacturer and transport provider.
Ask the supplier, forwarder and responsible importer to agree the shipment document list. It may include the commercial invoice, packing list, transport document and any origin, product or market documents required for the transaction. Reconcile model descriptions, quantities, package counts, weights and consignee details before document release.
Assign production release, inspection, booking, document preparation and shipment acceptance to named parties. Keep payment milestones and any inspection conditions in the written order. Agree the spare-parts list, fault-report information and responsibility for parts, labour and transport before the cabinets enter service.
Questions to resolve before the first order
Can I mix models in one order? Ask for a written quantity breakdown by model, electrical version, artwork and packing type. Confirm the minimum for each line and request a loading plan for the proposed mix.
How long will the order take? Ask what starts the quoted lead time: payment, drawing approval, artwork approval, sample acceptance or another agreed milestone. Separate sampling, production, inspection and transport, and get the dates confirmed for the chosen configuration.
Does a trade-fair sample prove that the export version is ready? No. Record the differences between the display cabinet and the offered model, then check the documents and sample evidence for the version you will buy.
Can I compare suppliers using only the lowest unit price? Compare the same cabinet and delivered scope first. A cheaper offer may exclude an option, document, packing method or service that another includes. Ask suppliers to resolve those differences in writing before choosing.
Ask for a structured quotation response
For each requirement, ask the supplier to identify confirmed scope, open questions, excluded cost and evidence still to be supplied. Include the contracting entity and manufacturing-site relationship as identity questions. Assign packaging, documents, inspection and shipment tasks to a named party instead of leaving them inside a general unit price.
| Requirement | Confirmed | Still open | Excluded cost or evidence |
|---|---|---|---|
| Model and options | Exact configuration and included items | Unselected hardware or materials | Setup, tooling or options not priced |
| Market files | Available applicable documents | Unresolved classification or revision | Tests, registrations or language work |
| Inspection and packing | Agreed method and supplied pack | Acceptance limits or sample plan | Third-party inspection or special protection |
| Shipment and support | Named place and responsibilities | Booking, import or local-service questions | Freight, duties, labour or parts exclusions |

Match carton marks to the shipment documents
Agree the carton-mark template with the packing plan before packing begins. Check the actual labels against the packing list and order scope, and resolve discrepancies before shipment release. Keep the agreed photographs and document revision together.
| Check | Match against | Evidence to retain |
|---|---|---|
| Model or item code | Order line and packing-list item | Readable label photograph |
| Quantity and carton numbering | Packing list and package count | Carton sequence and any exceptions |
| Net weight, gross weight and carton size | Actual packing record and packing list | Measured packing data for the configuration |
| Loose accessories | Agreed supply scope and accessory list | Packed accessory identification or photograph |
| Consignee and handling marks, where required | Agreed shipping instructions | Approved mark template and packing photograph |
Apply the checklist
Turn the import checklist into one RFQ.
Send the destination, intended use, cabinet format, product pack, quantity and document needs. A comparable quotation should identify assumptions, exclusions and the exact configuration being offered.
Start an import RFQ ↗