Prepare an indoor promotion layout that staff can operate
Start with the retail position and the activity: a fixed branded drinks point, an indoor launch display or a sampling area. Show where the shopper stands, where staff approach with stock and where the electrical cable runs. Review cleaning and service access as part of the placement, rather than after the cabinet has been delivered.
Provide the actual operating conditions and the intended loading routine. Indoor promotional use does not establish suitability for rain, direct sun or an unprotected outdoor event. If the project has unusual environmental or transport requirements, raise them before a configuration is quoted.
Build a loading brief from the packs you will sell
Send the dimensions of every can or bottle intended for the display, together with the number of flavours and the desired stock between refills. Ask the proposed layout to identify its assumptions about pack orientation, visibility and removal. A catalogue reference count cannot establish mixed-pack loading or a different package height.
For a promotion, consider the refill process alongside the visible stock. Describe how staff will rotate the assortment and check the opening with the proposed arrangement. Confirm the final loading and the product’s required storage conditions for the selected cabinet; the illustrated graphic or drink pack is not a capacity test.
Separate equipment, graphics and logistics in the quotation
List the selected lid format, cabinet quantity, quantity per artwork, destination, voltage and frequency. Add the placement sketch, pack measurements, artwork references and the required arrival date. State whether the first order is a review sample or a production requirement for a campaign rollout.
Ask the offer to identify the cabinet configuration, printed graphic scope, any one-time sample or development work, protective packing and shipping basis. Check how a full-lid or hinged-lid sample will be reviewed, and record the approved version. The applicable MOQ, schedule, documents and support responsibilities should be confirmed for that exact order.